MAMUSTANG ATLASTHE ENTHUSIAST'S REFERENCE

2016 workshop · Lighting

Reversing Lamps

417-01 Exterior Lighting

2016 MustangReference 5,687 / 6,619HTML edition
← Chapter contentsProcedure contents

Click to display connectors

3.7L Vehicles

Positive Lead

Measurement / Action

Negative Lead

C169-1

C1381B-32

Click to display connectors

5.0L Vehicles

Positive Lead

Measurement / Action

Negative Lead

C169-1

C175B-32

Is the resistance less than 3 ohms?

Yes

GO to A10

No

REPAIR the circuit.

A10 CHECK FOR CORRECT PCM (POWERTRAIN CONTROL MODULE) OPERATION

Disconnect and inspect all PCM connectors. Repair:

corrosion (install new connector or terminals – clean module pins) damaged or bent pins – install new terminals/pins pushed-out pins – install new pins as necessary

Reconnect thePCM connectors. Make sure they seat and latch correctly. Operate the system and determine if the concern is still present.

Is the concern still present?

Yes

CHECK OASIS for any applicable Technical Service Bulletins (TSBs). If a TSB exists for this concern, DISCONTINUE this test and FOLLOW TSB instructions. If no Technical Service Bulletins (TSBs) address this concern, INSTALL a new PCM.

REFER to: Powertrain Control Module (PCM) (303-14A Electronic Engine Controls - 2.3L EcoBoost (231kW/314PS), Removal and Installation).

REFER to: Powertrain Control Module (PCM) (303-14B Electronic Engine Controls - 3.7L Duratec (227kW/301PS), Removal and Installation).

REFER to: Powertrain Control Module (PCM) (303-14C Electronic Engine Controls - 5.0L 32V Ti-VCT/5.0L Ti-VCT V8 (308kW/418PS), Removal and Installation).

No

The system is operating correctly at this time. The concern may have been caused by module connections. ADDRESS the root cause of any connector or pin issues.

A11 CHECK FOR CORRECT BCM (BODY CONTROL MODULE) OPERATION

Source reference 5687

2016 Mustang workshop publication supplied to Mustang Atlas. Original technical text and illustrations; HTML formatting by Mustang Atlas. Source page numbering is retained for traceability. Follow the configuration, revision, warnings, and cross-references in the material. About this edition.