MAMUSTANG ATLASTHE ENTHUSIAST'S REFERENCE

2016 workshop · Climate Control System

Climate Control System - Vehicles With: Dual Automatic Temperature Control (DATC)

412-00 Climate Control System - General Information

2016 MustangReference 3,460 / 6,619HTML edition
← Chapter contentsProcedure contents

B2 CHECK THE A/C (AIR CONDITIONING) CLUTCH RELAY

Carry out the component test on the A/C clutch relay. Refer to Wiring Diagrams Cell 149 for schematic and connector information.

Did the relay pass the component test?

Yes

GO to B3

No

INSTALL a new A/C clutch relay.

B3 CHECK THE A/C (AIR CONDITIONING) CLUTCH RELAY CONTROL CIRCUIT FOR A SHORT TO VOLTAGE

Ignition OFF. Disconnect A/C clutch relay. Disconnect PCM, 2.3L C1551B, 3.7L C1381B or 5.0L and 5.2L C175B. Ignition ON. Measure:

Click to display connectors

Positive Lead

Measurement / Action

Negative Lead

A/C clutch relay socket 2

Ground

Is any voltage present?

Yes

REPAIR the circuit.

No

GO to B4

B4 CHECK THE A/C (AIR CONDITIONING) CLUTCH RELAY CONTROL CIRCUIT FOR A SHORT TO GROUND

Ignition OFF. Measure:

Click to display connectors

Positive Lead

Measurement / Action

Negative Lead

A/C clutch relay socket 2

Ground

Is the resistance greater than 10,000 ohms?

Yes

GO to B5

No

REPAIR the circuit.

B5 CHECK THE A/C (AIR CONDITIONING) CLUTCH RELAY CONTROL CIRCUIT FOR AN OPEN

Source reference 3460

2016 Mustang workshop publication supplied to Mustang Atlas. Original technical text and illustrations; HTML formatting by Mustang Atlas. Source page numbering is retained for traceability. Follow the configuration, revision, warnings, and cross-references in the material. About this edition.