2.3L
Positive Lead | Measurement / Action | Negative Lead |
|---|---|---|
A/C clutch relay socket 2 | C1551B-2 |
Click to display connectors
3.7L
Positive Lead | Measurement / Action | Negative Lead |
|---|---|---|
A/C clutch relay socket 2 | C1381B-15 |
Click to display connectors
5.0L or 5.2L
Positive Lead | Measurement / Action | Negative Lead |
|---|---|---|
A/C clutch relay socket 2 | C175B-15 |
Is the resistance less than 3 ohms?
Yes | GO to B6 | |
|---|---|---|
No | REPAIR the circuit. | |
B6 CHECK FOR CORRECT PCM (POWERTRAIN CONTROL MODULE) OPERATION
Ignition OFF. Disconnect and inspect all PCM connectors. Repair:
corrosion (install new connector or terminals – clean module pins) damaged or bent pins – install new terminals/pins pushed-out pins – install new pins as necessary
Reconnect all PCM connectors. Make sure they seat and latch correctly. Operate the system and determine if the concern is still present.
Is the concern still present?
Yes CHECK OASIS for any applicable Technical Service Bulletins (TSBs). If a TSB exists for
this concern, DISCONTINUE this test and FOLLOW TSB instructions. If no Technical Service Bulletins (TSBs) address this concern, INSTALL a new PCM. For 2.3L, REFER to: Powertrain Control Module (PCM) (303-14A Electronic Engine Controls - 2.3L EcoBoost (231kW/314PS), Removal and Installation).
2016 Mustang workshop publication supplied to Mustang Atlas. Original technical text and illustrations; HTML formatting by Mustang Atlas. Source page numbering is retained for traceability. Follow the configuration, revision, warnings, and cross-references in the material. About this edition.