MAMUSTANG ATLASTHE ENTHUSIAST'S REFERENCE

2016 workshop · Battery and Charging System

Generator - 5.0L 32V Ti-VCT

414-02 Generator and Regulator

2016 MustangReference 4,083 / 6,619HTML edition
← Chapter contentsProcedure contents

414-02 Generator and Regulator 2016 Mustang

Removal and Installation Procedure revision date: 01/16/2015

Generator - 5.0L 32V Ti-VCT

Base Part Number: 10300

Removal

NOTE: Removal steps in this procedure may contain installation details.

1. Disconnect the battery ground. Refer to: Battery Disconnect and Connect (414-01 Battery, Mounting and Cables, General Procedures).

2. Remove the air cleaner. Refer to: Air Cleaner (303-12C Intake Air Distribution and Filtering - 5.0L 32V Ti-VCT/5.0L Ti-VCT V8 (308kW/418PS), Removal and Installation).

3. Remove the accessory drive belt tensioner. Refer to: Accessory Drive Belt Tensioner (303-05C Accessory Drive - 5.0L 32V Ti-VCT/5.0L Ti-VCT V8 (308kW/418PS), Removal and Installation).

4. NOTICE: When installing the B+ terminal nut to the generator, finger-start the nut before tightening

or component damage may occur.

1. Disconnect the generator electrical connector.

2. Position the protective cover aside.

3. Remove the nut and position the generator B+ cable. Torque : 159 lb.in (18 Nm)

Generator - 5.0L 32V Ti-VCT — original illustration 1, reference 4083Original colors & callouts · Select to enlarge

5. Remove the nut, bolt and the generator. Torque : 35 lb.ft (47 Nm)

Source reference 4083

2016 Mustang workshop publication supplied to Mustang Atlas. Original technical text and illustrations; HTML formatting by Mustang Atlas. Source page numbering is retained for traceability. Follow the configuration, revision, warnings, and cross-references in the material. About this edition.