Positive Lead | Measurement / Action | Negative Lead |
|---|---|---|
C135-1 | Ground | |
C135-30 | Ground | |
C135-35 | Ground |
Are the voltages greater than 11 volts?
Yes | GO to B2 |
|---|---|
No | VERIFY the BJB fuses 5 (50A), 28 (30A) and 62 (5A) are OK. If OK, REPAIR the circuit in question. If not OK, REFER to the Wiring Diagrams manual to identify the possible causes of the circuit short. |
B2 CHECK THE ABS (ANTI-LOCK BRAKE SYSTEM) MODULE GROUND CIRCUIT FOR AN OPEN
Ignition OFF. Measure:
Click to display connectors
Positive Lead | Measurement / Action | Negative Lead |
|---|---|---|
C135-14 | Ground |
Is the resistance less than 3 ohms?
Yes | GO to B3 |
|---|---|
No | REPAIR the circuit. |
B3 CHECK THE HS-CAN2 (HIGH SPEED-CONTROLLER AREA NETWORK 2) CIRCUITS BETWEEN THE ABS (ANTI-LOCK BRAKE SYSTEM) MODULE AND THE DLC (DATA LINK CONNECTOR) FOR AN OPEN
Measure:
Click to display connectors
Positive Lead | Measurement / Action | Negative Lead |
|---|---|---|
C135-42 | C251-3 | |
C135-43 | C251-11 |
Are the resistances less than 3 ohms?
Yes | GO to B4 |
|---|---|
No | REPAIR the circuit in question. |
2016 Mustang workshop publication supplied to Mustang Atlas. Original technical text and illustrations; HTML formatting by Mustang Atlas. Source page numbering is retained for traceability. Follow the configuration, revision, warnings, and cross-references in the material. About this edition.