Positive Lead | Measurement / Action | Negative Lead |
|---|---|---|
C2383-1 | Ground |
Click to display connectors
Touchscreen display
Positive Lead | Measurement / Action | Negative Lead |
|---|---|---|
C2342-1 | Ground |
Is the voltage greater than 11 volts?
Yes | GO to O2 |
|---|---|
No | VERIFY the BCM fuse 32 (10A) is OK. If OK, REPAIR the circuit. If not OK, REFER to the Wiring Diagrams manual to identify the possible causes of the circuit short. |
O2 CHECK THE APIM (SYNC MODULE) GROUND CIRCUITS FOR AN OPEN
Ignition OFF. Measure:
Click to display connectors
Positive Lead | Measurement / Action | Negative Lead |
|---|---|---|
C2383-37 | Ground | |
C2383-38 | Ground |
Click to display connectors
Touchscreen display
Positive Lead | Measurement / Action | Negative Lead |
|---|---|---|
C2342-37 | Ground |
Is the resistance less than 3 ohms?
Yes | GO to O3 |
|---|---|
No | REPAIR the circuit. |
O3 CHECK THE HS-CAN1 (HIGH SPEED-CONTROLLER AREA NETWORK 1) CIRCUITS BETWEEN THE APIM (SYNC MODULE) AND THE DLC (DATA LINK CONNECTOR) FOR AN OPEN
2016 Mustang workshop publication supplied to Mustang Atlas. Original technical text and illustrations; HTML formatting by Mustang Atlas. Source page numbering is retained for traceability. Follow the configuration, revision, warnings, and cross-references in the material. About this edition.