9. Install the ground wire and nut. Torque : 89 lb.in (10 Nm) Install the wiring harness retainers.
10. Attach the wiring harness retainers to the engine front cover and stud bolt.
Source reference 218
2016 Mustang workshop publication supplied to Mustang Atlas. Original technical text and illustrations; HTML formatting by Mustang Atlas. Source page numbering is retained for traceability. Follow the configuration, revision, warnings, and cross-references in the material. About this edition.