Positive Lead | Measurement / Action | Negative Lead |
|---|---|---|
C1041-10 | Ground |
Is voltage present?
Yes | GO to F4 | |
|---|---|---|
No | INSTALL a new headlamp assembly. REFER to: Headlamp Assembly (417-01 Exterior Lighting, Removal and Installation). | |
F4 CHECK HIGH BEAM VOLTAGE SUPPLY CIRCUITS FOR A SHORT TO VOLTAGE
Ignition OFF. Disconnect: BCM C2280G. Ignition ON. Measure:
Click to display connectors
LH Headlamp
Positive Lead | Measurement / Action | Negative Lead |
|---|---|---|
C1021-10 | Ground |
Click to display connectors
RH Headlamp
Positive Lead | Measurement / Action | Negative Lead |
|---|---|---|
C1041-10 | Ground |
Is any voltage present?
Yes | REPAIR the circuit. | |
|---|---|---|
No | GO to F6 | |
F5 CHECK FOR CORRECT SCCM (STEERING COLUMN CONTROL MODULE) OPERATION
Disconnect and inspect all SCCM connectors. Repair:
corrosion (install new connector or terminals – clean module pins) damaged or bent pins – install new terminals/pins pushed-out pins – install new pins as necessary
Reconnect the SCCM connectors. Make sure they seat and latch correctly. Operate the system and determine if the concern is still present.
Is the concern still present?
Yes CHECK OASIS for any applicable Technical Service Bulletins (TSBs). If a TSB exists for
2016 Mustang workshop publication supplied to Mustang Atlas. Original technical text and illustrations; HTML formatting by Mustang Atlas. Source page numbering is retained for traceability. Follow the configuration, revision, warnings, and cross-references in the material. About this edition.