Positive Lead | Measurement / Action | Negative Lead |
|---|---|---|
C652A-1 | Ground |
Is the voltage greater than 11 volts?
Yes | GO to V2 |
|---|---|
No | VERIFY the BCM fuse 26 (30A) is OK. If OK, REPAIR the circuit. If not OK, REFER to the Wiring Diagrams manual to identify the possible causes of the circuit short. |
V2 CHECK THE PDM (PASSENGER DOOR MODULE) GROUND CIRCUIT FOR AN OPEN
Ignition OFF. Measure:
Click to display connectors
Positive Lead | Measurement / Action | Negative Lead |
|---|---|---|
C652A-2 | Ground |
Is the resistance less than 3 ohms?
Yes | GO to V3 |
|---|---|
No | REPAIR the circuit. |
V3 CHECK THE MS-CAN (MEDIUM SPEED-CONTROLLER AREA NETWORK) CIRCUITS BETWEEN THE PDM (PASSENGER DOOR MODULE) AND THE GWM (GATEWAY MODULE A) FOR AN OPEN
Disconnect: GWM C2431. Measure:
Click to display connectors
Positive Lead | Measurement / Action | Negative Lead |
|---|---|---|
C652A-7 | C2431-23 | |
C652A-6 | C2431-22 |
Are the resistances less than 3 ohms?
Yes | GO to V4 |
|---|---|
No | REPAIR the circuit in question. |
V4 CHECK FOR CORRECT PDM (PASSENGER DOOR MODULE) OPERATION
Ignition OFF. Disconnect and inspect all the PDM connectors and related in-line connectors. Repair:
corrosion (install new connector or terminals - clean module pins) damaged or bent pins - install new terminals/pins
2016 Mustang workshop publication supplied to Mustang Atlas. Original technical text and illustrations; HTML formatting by Mustang Atlas. Source page numbering is retained for traceability. Follow the configuration, revision, warnings, and cross-references in the material. About this edition.