MAMUSTANG ATLASTHE ENTHUSIAST'S REFERENCE

2016 workshop · Electronic Feature Group

Cruise Control

419-03A Cruise Control

2016 MustangReference 6,055 / 6,619HTML edition
← Chapter contentsProcedure contents

2.3L

Positive Lead

Measurement / Action

Negative Lead

C1551B-65

Ground

Click to display connectors

3.7L

Positive Lead

Measurement / Action

Negative Lead

C1381B-66

Ground

Click to display connectors

5.0L, 5.2L

Positive Lead

Measurement / Action

Negative Lead

C175B-66

Ground

Is the resistance less than 3 ohms?

Yes

INSTALL a new BPP switch. REFER to: Stoplamp Switch (417-01 Exterior Lighting, Removal and Installation).

No

REPAIR the signal circuit for an open.

B8 CHECK FOR CORRECT PCM (POWERTRAIN CONTROL MODULE) OPERATION

Ignition OFF. Disconnect and inspect all PCM connectors. Repair:

corrosion (install new connector or terminals - clean module pins) damaged or bent pins - install new terminals/pins pushed-out pins - install new pins as necessary

Reconnect the PCM connectors. Make sure they seat and latch correctly. Operate the system and determine if the concern is still present.

Is the concern still present?

Yes CHECK OASIS for any applicable Technical Service Bulletins (TSBs). If a TSB exists for

this concern, DISCONTINUE this test and FOLLOW TSB instructions. If no Technical Service Bulletins (TSBs) address this concern, INSTALL a new PCM. For 2.3L, REFER to: Powertrain Control Module (PCM) (303-14A Electronic Engine Controls - 2.3L EcoBoost (231kW/314PS), Removal and Installation).

For 3.7L, REFER to: Powertrain Control Module (PCM) (303-14B Electronic Engine Controls - 3.7L Duratec (227kW/301PS), Removal and Installation).

For 5.0L,

Source reference 6055

2016 Mustang workshop publication supplied to Mustang Atlas. Original technical text and illustrations; HTML formatting by Mustang Atlas. Source page numbering is retained for traceability. Follow the configuration, revision, warnings, and cross-references in the material. About this edition.