NOTE: The oil pan and the specified bolts must be installed and the oil pan aligned to the cylinder block within 4 minutes of sealant application. Final tightening of the oil pan bolts must be carried out within 60 minutes of sealant application.
2. Apply a 3 mm (0.11 in) bead of Motorcraft® High Performance Engine RTV Silicone to the sealing surface of the oil pan.
Material
: Motorcraft® High Performance Engine RTV Silicone / TA-357 (WSE-M4G323-A6)
3. Apply a 5.5 mm (0.21 in) bead of Motorcraft® High Performance Engine RTV Silicone to the 2 crankshaft seal retainer plate-to-cylinder block joint areas on the sealing surface of the oil pan.
Material
Original technical text and illustrations, formatted as HTML. Follow the engine, transmission, equipment, model and year specified in the source. Import and layout checks do not establish applicability to every 2015–2017 Mustang. About this collection.