NOTE: It may be necessary to rotate the camshafts slightly, to install the RH secondary timing assembly.
62. Position the RH VCT units and secondary timing chain onto the camshafts by aligning the holes in the VCT units with the dowel pins in the camshafts.
63. Install the new RH VCT unit bolts.
Torque:
Stage 1: 30 lb.ft (40 Nm)
Stage 2: Loosen: 1 turn(s)
Stage 3: 18 lb.ft (25 Nm)
Stage 4: 180°
Ford_Mustang_all_2015-2017.pdf · source reference 5380
Original technical text and illustrations, formatted as HTML. Follow the engine, transmission, equipment, model and year specified in the source. Import and layout checks do not establish applicability to every 2015–2017 Mustang. About this collection.