3. Locate and reference mark the replacement roof panel. Remove the roof panel after marking.
4. Apply a bead of adhesive to the roof rail flange. Material : Metal Bonding Adhesive / TA-1, 3M™ 08115, Fusor® 108B
Source reference 2269
2016 Mustang workshop publication supplied to Mustang Atlas. Original technical text and illustrations; HTML formatting by Mustang Atlas. Source page numbering is retained for traceability. Follow the configuration, revision, warnings, and cross-references in the material. About this edition.