Installation
Step 1
1. Connect the PCM electrical connectors.
2. Install the PCM and the retainers. Torque : 62 lb.in (7 Nm)
2. Position back the BJB.
Source reference 777
2016 Mustang workshop publication supplied to Mustang Atlas. Original technical text and illustrations; HTML formatting by Mustang Atlas. Source page numbering is retained for traceability. Follow the configuration, revision, warnings, and cross-references in the material. About this edition.