24. Remove and discard the gasket and studs.
Installation
6-Speed Automatic Transmission - 6R80/6-Speed Manual Transmission - MT82
1. Install new studs and new gasket. Torque : 18 lb.ft (25 Nm)
Source reference 256
2016 Mustang workshop publication supplied to Mustang Atlas. Original technical text and illustrations; HTML formatting by Mustang Atlas. Source page numbering is retained for traceability. Follow the configuration, revision, warnings, and cross-references in the material. About this edition.