Oil Pressure Switch
Materials
Name | Specification |
|---|---|
Thread Sealant with PTFE TA-24-B | WSK-M2G350-A2 |
Removal
NOTE: Removal steps in this procedure may contain installation details.
1. With the vehicle in NEUTRAL, position it on a hoist. Refer to: Jacking and Lifting - Overview (100-02 Jacking and Lifting, Description and Operation).
2. Disconnect the EOP switch electrical connector.
NOTE: If the oil pressure switch is to be reused, apply thread sealant.
Remove the EOP switch. Material : Thread Sealant with PTFE / TA-24-B (WSK-M2G350-A2) Torque : Stage 1: 124 lb.in (14 Nm) Stage 2: 180°
Installation
1. To install, reverse the removal procedure.
Copyright © 2016 Ford Motor Company
2016 Mustang workshop publication supplied to Mustang Atlas. Original technical text and illustrations; HTML formatting by Mustang Atlas. Source page numbering is retained for traceability. Follow the configuration, revision, warnings, and cross-references in the material. About this edition.