31. Attach the wiring harness retainer to the oil pan stud bolt.
Install the wiring harness retainer and the nut. Torque : 124 lb.in (14 Nm)
32. Attach the wiring harness retainers to the oil pan.
Source reference 560
2016 Mustang workshop publication supplied to Mustang Atlas. Original technical text and illustrations; HTML formatting by Mustang Atlas. Source page numbering is retained for traceability. Follow the configuration, revision, warnings, and cross-references in the material. About this edition.