9. Metal finish the repair area using typical metal finishing techniques.
10. Sealing work: All areas must be sealed to production level. Material : Seam Sealer / TA-2-B
11. Restore the corrosion protection. Refer to: Corrosion Prevention (501-25 Body Repairs - General Information, General Procedures).
12. Reposition the carpet and wiring harness.
13. Install the following items:
1. Refer to: Roof Panel (501-28 Roof Sheet Metal Repairs, Removal and Installation).
2. Refer to: Quarter Panel - Coupe (501-30 Rear End Sheet Metal Repairs, Removal and Installation).
3. Refer to: Rear Seat Cushion (501-10B Rear Seats, Removal and Installation).
Copyright © 2016 Ford Motor Company
2016 Mustang workshop publication supplied to Mustang Atlas. Original technical text and illustrations; HTML formatting by Mustang Atlas. Source page numbering is retained for traceability. Follow the configuration, revision, warnings, and cross-references in the material. About this edition.