2. NOTE: Make sure the surface is clean and free of foreign material.
Apply metal bonding adhesive to the floor pan flange. Material : Metal Bonding Adhesive / TA-1, 3M™ 08115, Fusor® 108B
3. NOTE: Make sure that the component is clean and free of foreign material and lubricant.
Apply metal bonding adhesive to the back panel reinforcement upper flanges. Material : Metal Bonding Adhesive / TA-1, 3M™ 08115, Fusor® 108B
2016 Mustang workshop publication supplied to Mustang Atlas. Original technical text and illustrations; HTML formatting by Mustang Atlas. Source page numbering is retained for traceability. Follow the configuration, revision, warnings, and cross-references in the material. About this edition.